pbi-cli/marketing/linkedin-posts/README.md
MinaSaad1 62680dd060 feat: v3.10.3 - opt-in Claude integration, dual-license DLL attribution, new pbi-cli entry point
## Claude Code integration now fully opt-in (Fix 3)
- `pbi connect` no longer writes to ~/.claude/ automatically
- New `pbi-cli` entry point: `pbi-cli skills install/uninstall/list`
- `pbi-cli skills install` shows exact paths before writing and requires y/N confirmation
- `pbi connect` prints a one-line tip if skills are not yet installed
- `pbi skills` subgroup removed from the `pbi` entry point

## DLL licensing compliance (Fix 1)
- pyproject.toml updated to PEP 639 SPDX dual expression:
  MIT AND LicenseRef-Microsoft-AS-Client-Libraries
- license-files declaration: LICENSE, THIRD_PARTY_LICENSES.md, NOTICE
- THIRD_PARTY_LICENSES.md: full verbatim MS Analysis Services Client Libraries EULA
- NOTICE: short-form attribution for wheel redistribution
- src/pbi_cli/dlls/README.md: in-directory sentinel for the MS DLLs
- setuptools requirement bumped to >=77.0 for PEP 639 support

## SECURITY.md rewrite (Fix 2)
- Supported versions table updated to 3.10.x
- Architecture section: no MCP server, no subprocess, direct pythonnet interop
- Global Configuration Modifications section updated to reflect opt-in model
- Bundled Binaries section references THIRD_PARTY_LICENSES.md

## Documentation
- README.md, README.pypi.md: corrected 3-step setup flow
- CHANGELOG.md: [3.10.3] entry
- CONTRIBUTING.md: pbi skills -> pbi-cli skills
- All 7 semantic model SKILL.md files: prerequisites updated to 3-step flow
- New SVG/PNG marketing and documentation assets
2026-04-05 20:37:05 +02:00

66 lines
2.8 KiB
Markdown

# LinkedIn Post Campaign: pbi-cli Vibe BI
## Context
- Post 0 (DONE, March 28): Launch announcement, performed well
- Campaign goal: Set the land for "vibe modeling" as a concept, build awareness for pbi-cli + Claude Code + Power BI
## Posting Strategy
**Phase 1: Hook & Educate** (Days 1-3 after launch)
Build on the launch momentum. Give people the full picture, then hit them with the "why."
| # | File | Image/Asset | Angle |
|---|------|-------------|-------|
| 01 | 01-carousel-overview.md | pbi-cli-vibe-modeling.pdf | Full carousel walkthrough |
| 02 | 02-why-pbi-cli.md | before-after.png | Problem/solution framing |
| 03 | 03-token-cost.md | token-cost.png | Technical argument vs MCP |
**Phase 2: Show the Magic** (Days 4-6)
Remove friction. Show how simple it is and the "aha" moments.
| # | File | Image/Asset | Angle |
|---|------|-------------|-------|
| 04 | 04-how-it-works.md | how-it-works.png | 3-step onboarding |
| 05 | 05-chat-demo.md | chat-demo.png | The conversational UX |
| 06 | 06-bulk-operations.md | bulk-operations.png | Productivity proof |
**Phase 3: Skill Deep Dives** (Days 7-12)
One post per major capability. Each stands alone.
| # | File | Image/Asset | Angle |
|---|------|-------------|-------|
| 07 | 07-dax-skill.md | dax-skill.png | DAX without memorizing syntax |
| 08 | 08-dax-debugging.md | dax-debugging.png | Claude as debug partner |
| 09 | 09-model-health.md | model-health-check.png | Instant model audit |
| 10 | 10-modeling-skill.md | modeling-skill.png | Schema from description |
| 11 | 11-backup-restore.md | backup-restore.png | Safety net for risky changes |
| 12 | 12-rls-testing.md | rls-testing.png | Security without the GUI |
**Phase 4: Enterprise & Architecture** (Days 13-16)
For the more technical audience. Builds credibility.
| # | File | Image/Asset | Angle |
|---|------|-------------|-------|
| 13 | 13-deploy-secure.md | deploy-secure.png | Version control + RLS combined |
| 14 | 14-docs-diagnostics.md | docs-diagnostics.png | Documentation + performance |
| 15 | 15-architecture.md | architecture-flow.png | Under the hood |
| 16 | 16-feature-scope.md | feature-grid.png + skills-hub.png | Full scope: 22 groups, 7 skills |
**Phase 5: CTA & Wrap** (Day 17)
Close the loop. Drive installs.
| # | File | Image/Asset | Angle |
|---|------|-------------|-------|
| 17 | 17-cta-start.md | cta-start.png | Final CTA |
**Phase 6: Vibe BI Release** (1 week after Phase 5)
Announce the evolution from Vibe Modeling to Vibe BI with the report layer.
| # | File | Image/Asset | Angle |
|---|------|-------------|-------|
| 19 | 19-release-vibe-bi.md | release-vibe-bi.png | v3.10.1 release, Modeling + Reporting |
| 20 | 20-auto-sync.md | auto-sync-ai.png | Desktop Auto-Sync technique |
## Links (include in every post)
- Landing page: mina-saad.com/pbi-cli
- GitHub: https://github.com/MinaSaad1/pbi-cli