pbi-cli/marketing/linkedin-posts/README.md
MinaSaad1 62680dd060 feat: v3.10.3 - opt-in Claude integration, dual-license DLL attribution, new pbi-cli entry point
## Claude Code integration now fully opt-in (Fix 3)
- `pbi connect` no longer writes to ~/.claude/ automatically
- New `pbi-cli` entry point: `pbi-cli skills install/uninstall/list`
- `pbi-cli skills install` shows exact paths before writing and requires y/N confirmation
- `pbi connect` prints a one-line tip if skills are not yet installed
- `pbi skills` subgroup removed from the `pbi` entry point

## DLL licensing compliance (Fix 1)
- pyproject.toml updated to PEP 639 SPDX dual expression:
  MIT AND LicenseRef-Microsoft-AS-Client-Libraries
- license-files declaration: LICENSE, THIRD_PARTY_LICENSES.md, NOTICE
- THIRD_PARTY_LICENSES.md: full verbatim MS Analysis Services Client Libraries EULA
- NOTICE: short-form attribution for wheel redistribution
- src/pbi_cli/dlls/README.md: in-directory sentinel for the MS DLLs
- setuptools requirement bumped to >=77.0 for PEP 639 support

## SECURITY.md rewrite (Fix 2)
- Supported versions table updated to 3.10.x
- Architecture section: no MCP server, no subprocess, direct pythonnet interop
- Global Configuration Modifications section updated to reflect opt-in model
- Bundled Binaries section references THIRD_PARTY_LICENSES.md

## Documentation
- README.md, README.pypi.md: corrected 3-step setup flow
- CHANGELOG.md: [3.10.3] entry
- CONTRIBUTING.md: pbi skills -> pbi-cli skills
- All 7 semantic model SKILL.md files: prerequisites updated to 3-step flow
- New SVG/PNG marketing and documentation assets
2026-04-05 20:37:05 +02:00

2.8 KiB

LinkedIn Post Campaign: pbi-cli Vibe BI

Context

  • Post 0 (DONE, March 28): Launch announcement, performed well
  • Campaign goal: Set the land for "vibe modeling" as a concept, build awareness for pbi-cli + Claude Code + Power BI

Posting Strategy

Phase 1: Hook & Educate (Days 1-3 after launch) Build on the launch momentum. Give people the full picture, then hit them with the "why."

# File Image/Asset Angle
01 01-carousel-overview.md pbi-cli-vibe-modeling.pdf Full carousel walkthrough
02 02-why-pbi-cli.md before-after.png Problem/solution framing
03 03-token-cost.md token-cost.png Technical argument vs MCP

Phase 2: Show the Magic (Days 4-6) Remove friction. Show how simple it is and the "aha" moments.

# File Image/Asset Angle
04 04-how-it-works.md how-it-works.png 3-step onboarding
05 05-chat-demo.md chat-demo.png The conversational UX
06 06-bulk-operations.md bulk-operations.png Productivity proof

Phase 3: Skill Deep Dives (Days 7-12) One post per major capability. Each stands alone.

# File Image/Asset Angle
07 07-dax-skill.md dax-skill.png DAX without memorizing syntax
08 08-dax-debugging.md dax-debugging.png Claude as debug partner
09 09-model-health.md model-health-check.png Instant model audit
10 10-modeling-skill.md modeling-skill.png Schema from description
11 11-backup-restore.md backup-restore.png Safety net for risky changes
12 12-rls-testing.md rls-testing.png Security without the GUI

Phase 4: Enterprise & Architecture (Days 13-16) For the more technical audience. Builds credibility.

# File Image/Asset Angle
13 13-deploy-secure.md deploy-secure.png Version control + RLS combined
14 14-docs-diagnostics.md docs-diagnostics.png Documentation + performance
15 15-architecture.md architecture-flow.png Under the hood
16 16-feature-scope.md feature-grid.png + skills-hub.png Full scope: 22 groups, 7 skills

Phase 5: CTA & Wrap (Day 17) Close the loop. Drive installs.

# File Image/Asset Angle
17 17-cta-start.md cta-start.png Final CTA

Phase 6: Vibe BI Release (1 week after Phase 5) Announce the evolution from Vibe Modeling to Vibe BI with the report layer.

# File Image/Asset Angle
19 19-release-vibe-bi.md release-vibe-bi.png v3.10.1 release, Modeling + Reporting
20 20-auto-sync.md auto-sync-ai.png Desktop Auto-Sync technique

Links (include in every post)