# Release Process And Cadence
|
|
|
|
Argo CD is being developed using the following process:
|
|
|
|
* Maintainers commit to work on set of features and enhancements and create GitHub milestone to track the work.
|
|
* We are trying to avoid delaying release and prefer moving the feature into the next release if we cannot complete it on time.
|
|
* The new release is published every **3 month**.
|
|
* Critical bug-fixes are cherry-picked into the release branch and delivered using patch releases as frequently as needed.
|
|
|
|
## Release Planning
|
|
|
|
We are using GitHub milestones to perform release planning and tracking. Each release milestone includes two type of issues:
|
|
|
|
* Issues that maintainers committed to working on. Maintainers decide which features they are committing to work on during the next release based on
|
|
their availability. Typically issues added offline by each maintainer and finalized during the contributors' meeting. Each such issue should be
|
|
assigned to maintainer who plans to implement and test it.
|
|
* Nice to have improvements contributed by community contributors. Nice to have issues are typically not critical, smallish enhancements that could
|
|
be contributed by community contributors. Maintainers are not committing to implement them but committing to review PR from the community.
|
|
|
|
The milestone should have a clear description of the most important features as well as the expected end date. This should provide clarity to end-users
|
|
about what to expect from the next release and when.
|
|
|
|
In addition to the next milestone, we need to maintain a draft of the upcoming release milestone.
|
|
|
|
## Community Contributions
|
|
|
|
We receive a lot of contributions from our awesome community, and we're very grateful for that fact. However, reviewing and testing PRs is a lot of (unplanned) work and therefore, we cannot guarantee that contributions (especially large or complex ones) made by the community receive a timely review within a release's time frame. Maintainers may decide on their own to put work on a PR together with the contributor and in this case, the maintainer will self-assigned the PR and thereby committing to review, eventually merge and later test it on the release scope.
|
|
|
|
## Release Testing
|
|
|
|
We need to make sure that each change, both from maintainers and community contributors, is tested well and have someone who is going to fix last-minute
|
|
bugs. In order to ensure it, each merged pull request must have an assigned maintainer before it gets merged. The assigned maintainer will be working on
|
|
testing the introduced changes and fixing of any introduced bugs.
|
|
|
|
We have a code freeze period two weeks before the release until the release branch is created. During code freeze no feature PR should be merged and it is ok
|
|
to merge bug fixes.
|
|
|
|
Maintainers assigned to a PR that's been merged should drive testing and work on fixing last-minute issues. For tracking purposes after verifying PR the assigned
|
|
the maintainer should label it with a `verified` label.
|
|
|
|
## Releasing
|
|
|
|
The releasing procedure is described in [releasing](./releasing.md) document. Before closing the release milestone following should be verified:
|
|
|
|
- [ ] All merged PRs and verified (verify and remove `needs-verification` label):
|
|
- [ ] Triage issues reported by `yarn audit` and ensure there are no exploitable security issues.
|
|
- [ ] Roadmap is updated based one current release changes
|
|
- [ ] Next release milestone is created
|
|
- [ ] Upcoming release milestone is updated |