mirror of
https://github.com/twentyhq/twenty
synced 2026-04-21 13:37:22 +00:00
## Summary - **Merge queue optimization**: Created a dedicated `ci-merge-queue.yaml` workflow that only runs Playwright E2E tests on `ubuntu-latest-8-cores`. Removed `merge_group` trigger from all 7 existing CI workflows (front, server, shared, website, sdk, zapier, docker-compose). The merge queue goes from ~30+ parallel jobs to a single focused E2E job. - **Label-based merge queue simulation**: Added `run-merge-queue` label support so developers can trigger the exact merge queue E2E pipeline on any open PR before it enters the queue. - **Prettier in lint**: Chained `prettier --check` into `lint` and `prettier --write` into `lint --configuration=fix` across `nx.json` defaults, `twenty-front`, and `twenty-server`. Prettier formatting errors are now caught by `lint` and fixed by `lint:fix` / `lint:diff-with-main --configuration=fix`. ## After merge (manual repo settings) Update GitHub branch protection required status checks: 1. Remove old per-workflow merge queue checks (`ci-front-status-check`, `ci-e2e-status-check`, `ci-server-status-check`, etc.) 2. Add `ci-merge-queue-status-check` as the required check for the merge queue
11 lines
242 B
JSON
11 lines
242 B
JSON
{
|
|
"extends": "../../tsconfig.base.json",
|
|
"compilerOptions": {
|
|
"outDir": "../../.cache/tsc",
|
|
"esModuleInterop": true,
|
|
"moduleResolution": "bundler",
|
|
"module": "esnext",
|
|
"types": ["node"]
|
|
},
|
|
"include": ["**/*.ts"]
|
|
}
|