## Summary
### Cache invalidation fix
- After migrating object/field permissions to syncable entities (#18609,
#18751, #18567), changes to `flatObjectPermissionMaps`,
`flatFieldPermissionMaps`, or `flatPermissionFlagMaps` no longer
triggered `rolesPermissions` cache invalidation
- This caused stale permission data to be served, leading to flaky
`permissions-on-relations` integration tests and potentially incorrect
permission enforcement in production after object permission upserts
- Adds the three permission-related flat map keys to the condition that
triggers `rolesPermissions` cache recomputation in
`WorkspaceMigrationRunnerService.getLegacyCacheInvalidationPromises`
- Clears memoizer after recomputation to prevent concurrent
`getOrRecompute` calls from caching stale data
### Docker Hub rate limit fix
- CI service containers (postgres, redis, clickhouse) and `docker
run`/`docker build` steps were pulling from Docker Hub
**unauthenticated**, hitting the 100-pull-per-6-hour rate limit on
shared GitHub-hosted runner IPs
- Adds `credentials` blocks to all service container definitions and
`docker/login-action` steps before `docker run`/`docker compose`
commands
- Uses `vars.DOCKERHUB_USERNAME` + `secrets.DOCKERHUB_PASSWORD`
(matching the existing twenty-infra convention)
- Affected workflows: ci-server, ci-merge-queue, ci-breaking-changes,
ci-zapier, ci-sdk, ci-create-app-e2e, ci-website,
ci-test-docker-compose, preview-env-keepalive, spawn-twenty-docker-image
action
## Summary
- **Reduce app-dev image size** by stripping ~60MB of build artifacts
not needed at runtime from the server build stage: `.js.map` source maps
(29MB), `.d.ts` type declarations (9MB), compiled test files (14MB), and
unused package source directories (~9MB).
- **Add CI smoke test** for the `twenty-app-dev` all-in-one Docker
image, running in parallel with the existing docker-compose test. Builds
the image, starts the container, and verifies `/healthz` returns 200.
## Test plan
- [x] Built image locally and verified server, worker, Postgres, and
Redis all start correctly
- [x] Verified `/healthz` returns 200 and frontend serves at `/`
- [ ] CI `test-compose` job passes (existing test, renamed from `test`)
- [ ] CI `test-app-dev` job passes (new parallel job)
Made with [Cursor](https://cursor.com)
## Summary
- Re-enable one lint rule that was temporarily disabled during the
ESLint-to-Oxlint migration:
- **`twenty/sort-css-properties-alphabetically`** in twenty-front — 578
violations auto-fixed across 390 files
- Document why **`typescript/consistent-type-imports`** cannot be
auto-fixed in twenty-server: NestJS relies on `emitDecoratorMetadata`
for DI, so converting constructor parameter imports to `import type`
erases them at compile time and breaks dependency injection at runtime
- Right-size CI runners, reducing 8-core usage from 18 jobs to 3:
| Change | Jobs | Rationale |
|--------|------|-----------|
| **Keep 8-core** | `ci-merge-queue/e2e-test`,
`ci-front/front-sb-build`, `ci-front/front-build` | Heavy builds needing
max CPU + memory (10GB NODE_OPTIONS, full Storybook webpack bundling) |
| **8-core → 4-core** | `ci-server` (build, lint-typecheck, validation,
test, integration-test), `ci-front/front-sb-test`,
`ci-zapier/server-setup`, `ci-sdk/sdk-e2e-test` | Already sharded into
10-12 parallel instances, I/O-bound (DB/Redis), or moderate single
builds |
| **8-core → 2-core** | `ci-emails/emails-test` | Trivially lightweight
(build + curl health check) |
| **Removed** | `ci-front/front-chromatic-deployment` | Dead code —
permanently disabled with `if: false` |
- Fix merge queue CI issues:
- **Concurrency**: Use `merge_group.base_ref` instead of unique merge
group ref so new queue entries cancel previous runs
- **Required status checks**: Add `merge_group` trigger to all 6
required CI workflows (front, server, shared, website, docker-compose,
sdk) with `changed-files-check` auto-skipped for merge_group events —
status check jobs auto-pass without re-running full CI
- **Build caching**: Add Nx build cache restore/save to E2E test job
with fallback to `main` branch cache for faster frontend and server
builds
## Test plan
- [ ] CI passes on this PR (verifies lint rule auto-fix works)
- [ ] Verify 4-core runner jobs complete within their 30-minute timeouts
- [ ] Verify merge queue status checks auto-pass (ci-front-status-check,
ci-server-status-check, etc.)
- [ ] Verify merge queue E2E concurrency cancels previous runs when a
new PR enters the queue
## Summary
- **Merge queue optimization**: Created a dedicated
`ci-merge-queue.yaml` workflow that only runs Playwright E2E tests on
`ubuntu-latest-8-cores`. Removed `merge_group` trigger from all 7
existing CI workflows (front, server, shared, website, sdk, zapier,
docker-compose). The merge queue goes from ~30+ parallel jobs to a
single focused E2E job.
- **Label-based merge queue simulation**: Added `run-merge-queue` label
support so developers can trigger the exact merge queue E2E pipeline on
any open PR before it enters the queue.
- **Prettier in lint**: Chained `prettier --check` into `lint` and
`prettier --write` into `lint --configuration=fix` across `nx.json`
defaults, `twenty-front`, and `twenty-server`. Prettier formatting
errors are now caught by `lint` and fixed by `lint:fix` /
`lint:diff-with-main --configuration=fix`.
## After merge (manual repo settings)
Update GitHub branch protection required status checks:
1. Remove old per-workflow merge queue checks (`ci-front-status-check`,
`ci-e2e-status-check`, `ci-server-status-check`, etc.)
2. Add `ci-merge-queue-status-check` as the required check for the merge
queue
## Summary
- Replaces all `depot-ubuntu-24.04` runners with `ubuntu-latest`
- Replaces all `depot-ubuntu-24.04-8` runners with
`ubuntu-latest-8-cores`
- Updates storybook build cache keys in ci-front.yaml to reflect the
runner name change
Reverts the temporary Depot migration introduced in #18163 / #18179
across all 23 workflow files.
Since tests are now run in the pre-merge queue with the latest main
version, they need not to be run again when merged into main, it would
be the exact same thing
## Problem
CI workflow started timing out on October 14, 2025 after commit
`d750df7fff` removed the trailing newline from `.env.example`.
## Root Cause
When `.env.example` lacks a trailing newline:
```bash
# Last line without newline
# CLICKHOUSE_URL=...twenty
```
And CI runs:
```bash
echo "NODE_PORT=3002" >> .env
```
Result:
```bash
# CLICKHOUSE_URL=...twentyNODE_PORT=3002 ← Commented out!
```
Server starts on default port 3000 instead of 3002, health check fails.
## Fix
1. **Restore trailing newline** to `.env.example`
2. **Make all CI `.env` operations robust** by adding `echo "" >> .env`
before appending
3. **Simplified `set_env_var`** function to always add newline first
Now works regardless of whether template files have trailing newlines.
## Files Changed
- 6 CI workflow files
- 1 .env.example file
## Problem
The concurrency rules in CI workflows were cancelling in-progress test
runs even on the main branch. This caused inconsistent check counts when
multiple commits were pushed in quick succession.
## Solution
Updated `cancel-in-progress` in all CI workflows to be conditional:
- **On main branch**: Tests run to completion (no cancellation)
- **On feature branches**: Tests are cancelled when new commits are
pushed (saves CI resources)
## Changes
Modified 11 workflow files to use:
```yaml
cancel-in-progress: ${{ github.ref != 'refs/heads/main' }}
```
This ensures every commit to main gets fully tested while maintaining
efficiency on feature branches.
This PR updates the docker-compose installation documentation and env
sample to improve the setup experience.
- Updates the URLs for raw files to reference main branch, which is
likely where new users will be pulling from initially. This seems to be
the most straightforward option; assume that advanced users who want to
retrieve it from a particular tag will know to change the URL for their
scenario.
- Fixes an improperly stated curl command.
- Adds a note that the PGPASSWORD_SUPERUSER should be URL-safe. This is
required since the value is later concat into a PG_DATABASE_URL as a
URL, and expected to be in proper URL format. Touches on #8597.
---------
Co-authored-by: Félix Malfait <felix@twenty.com>
Co-authored-by: Félix Malfait <felix.malfait@gmail.com>
We will remove the `twenty-postgres` image that was used for local
development and only use `twenty-postgres-pilo` (which we use in prod),
bringing the development environment closer to prod and avoiding having
to maintain 2 images.
Instead of provisioning the super user after the db initialization, we
directly rely on the superuser provided by Spilo for simplicity. We also
introduce a change that tries to create the right database (`default` or
`test`) based on the context.
How to test:
```
docker build -t twentycrm/twenty-postgres-spilo:latest -f ./packages/twenty-docker/twenty-postgres-spilo/Dockerfile .
docker images --no-trunc | grep twenty-postgres-spilo
postgres-on-docker:
docker run \
--name twenty_pg \
-e PGUSER_SUPERUSER=twenty \
-e PGPASSWORD_SUPERUSER=twenty \
-e ALLOW_NOSSL=true \
-v twenty_db_data:/home/postgres/pgdata \
-p 5432:5432 \
REPLACE_WITH_IMAGE_ID
```
This Pull Request addresses the need to optimize our Continuous
Integration (CI) workflows for Playwright tests and release processes.
The changes implemented aim to reduce unnecessary resource usage by
conditionally executing jobs based on relevant file changes and
Implement https://github.com/tj-actions/changed-files step
## Changes logs
- Updated `ci-test-docker-compose.yaml , ci-chrome-extension.yaml ` to
check for changed files before running tests.
- Updated `ci-front.yaml , ci-utils.yaml , ci-website.yaml ,
ci-server.yaml` to check for changed files before running tests.
- Enhanced `playwright.yml` to skip unnecessary tests based on file
changes.
Add support for a new SENTRY_RELEASE and SENTRY_ENVIRONMENT env.
It is optional and allows to init sentry with a Release version and an
env (used internally at Twenty).
Docker image have been updated do intergrate the new env as an Argument