mirror of
https://github.com/fleetdm/fleet
synced 2026-05-23 08:58:41 +00:00
Handbook: Better links to OKRs in product groups (#21168)
Link directly to roadmap rows (range)
This commit is contained in:
parent
5c2fceef87
commit
f77cb7f7c8
1 changed files with 1 additions and 1 deletions
|
|
@ -310,7 +310,7 @@ Before the **🎁🗣 Feature Fest** meeting, the [Customer renewals DRI](https:
|
|||
|
||||
All community and contributor requests (non-customer) are left in the inbox. A high priority customer request may be a request that's blocking a customer from getting their job done or a request that's critical for customer renewal.
|
||||
|
||||
Before the meeting, the Feature prioritization DRI adds requests from Fleet's roadmap that are planned for the next design sprint. The quarterly roadmap is in the [OKRs spreadsheet](https://docs.google.com/spreadsheets/d/1Hso0LxqwrRVINCyW_n436bNHmoqhoLhC8bcbvLPOs9A/edit?gid=0#gid=0).
|
||||
Before the meeting, the Feature prioritization DRI adds requests from Fleet's roadmap that are planned for the next design sprint. The quarterly roadmap is in the [OKRs spreadsheet](https://docs.google.com/spreadsheets/d/1Hso0LxqwrRVINCyW_n436bNHmoqhoLhC8bcbvLPOs9A/edit?gid=1846478041#gid=1846478041&range=393:419).
|
||||
|
||||
At the **🎁🗣 Feature Fest** meeting, the Feature prioritization DRI weighs all requests in the inbox. When the team weighs a request, it is immediately prioritized or put to the side (not prioritized).
|
||||
|
||||
|
|
|
|||
Loading…
Reference in a new issue