Product Design handbook (#27247)

- Update what Product Designers work on when we hit capacity
This commit is contained in:
Noah Talerman 2025-03-18 15:46:48 -04:00 committed by GitHub
parent e9e0f7b7e3
commit 26fe4012db
No known key found for this signature in database
GPG key ID: B5690EEEBB952194

View file

@ -78,11 +78,10 @@ Additionally:
- If the story has a requester and the title and/or description change during drafting (scope change), notify the requester. The customer DRI should confirm that the updated scope still meets the requester's needs.
- Each [product group](https://fleetdm.com/handbook/company/product-groups#current-product-groups) stops drafting once they reach engineering capacity for the upcoming engineering sprint. This way, we avoid creating a backlog which causes us to spend time updating soon-to-be stale designs. It's up to the product group's Product Designer to stop drafting and shift their focus to the following tasks:
- Run back through the unestimated user stories and do extra iterations to make sure they're as good as we think they are
- Run back through the test plan for unestimated user stories and make sure they're as good as we think they are
- Go through the Fleet UI and look for bad/inconsistent text
- Go through bugs to see if theres Product Design input needed
- Go through the reference docs and look for issues (inconsistent naming/formatting, broken links, etc.)
- File stories and draft changes for making form fields in the Fleet UI consistent (fixing conventions, moving out the tooltips, etc.)
- File stories and draft changes for bringing the screen width down to 375px. (one screen at a time, in which we can squeeze it into engineering sprints as front-end only work, small stories, doesn't compete with other stuff)
>**Questions and missing information:** Take a screenshot of the area in Figma and add a comment in the story's GitHub issue. Figma does have a commenting system, but we use GitHub issues so that all questions/conversation live in one place.
>