angular/integration/bazel_workspace_tests
Paul Gschwendtner 0facba5b70 build: update bazel integration test to RNJ v5.4.0 and Sass 1.50.0 (#45470)
Updates Bazel integration to RNJ v5.4.0. This is needed since it relies
on Angular Bazel which now relies on an internal pkg_npm helper breaking
change.

PR Close #45470
2022-04-11 21:01:09 +00:00
..
bazel_ngtsc_plugin build: update bazel integration test to RNJ v5.4.0 and Sass 1.50.0 (#45470) 2022-04-11 21:01:09 +00:00
BUILD.bazel refactor: setup bazel integration test with new integration rule (#44238) 2021-12-08 13:42:41 -05:00