This updates the enter and leave logic to use the stored LView data to dispatch the enter and leave animations at the right points in the lifecycle. This should fix issues with signals not being available yet, parallel animations, and also eliminate the need for the element registry.
fixes: #63391fixes: #63388fixes: #63369
PR Close#63710
This commit removes a number of obsolete integration tests and also removes some e2e tests for a few remianing apps, since they are not adding value, but cause extra time to spend on CI.
PR Close#60594
In Bazel, the `CI` environment variable is not set due to its hermetic nature. As a result, caching is enabled by default, which includes Vite pre-bundling. This is unnecessary in CI environments.
In some cases, this leads to errors during CI runs when the Vite build is closed or canceled prematurely, resulting in the following errors:
```
Error: R] The build was canceled
Error: R] Terminating worker thread [plugin angular-vite-optimize-deps]
```
PR Close#57863
This commit also performs lock file maintenance on all integration
tests, fixing some ambigous ESM/CJS dependency graph issues.
e.g.
```
Unknown error: Error [ERR_REQUIRE_ESM]: require() of ES Module /tmp/ng-integration-test-aTpQOT/test-sandbox/node_modules/string-width/index.js from /tmp/ng-integration-test-aTpQOT/test-sandbox/node_modules/cliui/build/index.cjs not supported.
Instead change the require of index.js in /tmp/ng-integration-test-aTpQOT/test-sandbox/node_modules/cliui/build/index.cjs to a dynamic import() which is available in all CommonJS modules.
------------------------------------------
```
Closes#56261.
PR Close#56364